Home
NYCT
Staten Island
Port Authority
Commuter Rail
Rail America
Forms
Contributors
Links
|
|
|
|
Cold
Weather Plans
 |
Plan 1- Temperatures forecast between 30F and 11F
RTO. Subdivion "A" & "B" will continue normal
schedules.
Train cutting will be discontinued.
Trains stored in the open will be 'Cut In' |
 | Plan 2 -
Temperatures forecast at 10 F and below.
G.O.'s and work trains will be cancelled where
needed.
Operate maximum length trains on all lines except OPTO lines.
Trains will be relocated to underground storage locations. |
 | Plan 2 (MOD)
G.O.'s and work trains will be cancelled where needed.
At the discretion of District General Superintendent, underground storage
on affected lines
will be in effect.
Operate maximum length trains on all lines except OPTO lines. |
 | Plan 3 -
Forecast of ice storm, sleet and freezing rain.
Subways Storm Control Center at 370 Jay
Street activated.
Operate maximum length trains on all lines except OPTO lines.
Local Storm Fighting Centers activated.
All Ice Storm fighting equipment prepared for activation.
G.O.'s and work trains will be cancelled where needed. |
 | Plan 4 -
Forecast of snow (5 inches or more)
Subways Storm Control Center at 370 Jay Street activated.
Operate maximum length trains on all lines Including OPTO lines.
Underground storage in effect.
Local Storm Fighting Centers activated.
All Ice Storm fighting equipment prepared for activation.
G.O.'s and work trains will be cancelled where needed.
|
|
|
|